Firm Name: SMMA
Roles: Architect I and Visualization Lead
Duration: 2/6/2017 to 5/25/18
Time Spent on Project: 1,165 Hours
Phases Engaged: Schematic Design, Design Development, and Construction Documentation
Project Description: Weaving new construction with existing buildings on a historic site, the new Somerville High School will serve to better connect 21st Century learning with the vibrancy of its community. Existing and new horizontal angular lines are warped and influenced by external topography, street grids and the historic context and influence internal vertical changes in levels that serve to physically link the spaces within the building to foster relationships between once isolated programs, the students and educators, and the City and its citizens.